L&T Emerges As Lowest Bidder For 237-Km Viaduct Of Bullet Train Project
The infrastructure company has emerged as the lowest bidder for the design and construction of 237 km length of viaduct for 508-km Mumbai-Ahmedabad High Speed Rail corridor.
The infrastructure company has emerged as the lowest bidder for the design and construction of 237 km length of viaduct for 508-km Mumbai-Ahmedabad High Speed Rail corridor.